Journey to Partnering
We bring commercial understanding and expertise specifically in relation to property development. This enables us to obtain a high-level view to assess the current state and to plan the next steps to move forward. Our ‘tima’ come equipped with a wide range of skills from development advisory through to providing a full partnership service offering and all the in-betweens. We use methods (such as a GAP analysis etc) so we can assess your resource requirements and match those to the resources available to see what will best suit you.
Process to Partnering
![](https://www.tetimata.co.nz/wp-content/uploads/2022/11/276dd188e3f8504e45c06aacd53d264d.png)
Tahi
Please note this assessment would be a first blush, without the necessary detail needed to proceed to implementation.
Before moving to the engagement phase we should enter into an agreement to capture the intent of both Partners to proceed. We have loosely referred to this as a commitment to proceed. At this point we should have a Heads of Agreement to ensure clarity of understanding for each Partners respective roles and responsibilities. The intention here is to legally bind as Partners. (Timeframe guideline 1-2 months)
Rua
Engagement/Initiating Partnership – During this phase we would look to lead the development of the following with you:
- Concept design, scope definition and feasibility study
- BIM modelling and design coordination
- Commissioning consultants
- Procure development funding
- Obtain consent from the relevant Local Government authority
- Fund cost to serve during partnership initiation and preliminary costs
(Timeframe guideline 6-9 months)
Before moving to the Implementation/Partnership phase we should revisit the Heads of Agreement and ensure that it adequately captures further roles and responsibilities during this next phase and make the necessary amendments to the term sheets. The kind of changes that we can anticipate at this stage may be to do with how we resource specific tasks by Partners. Also should the Partners decide to take a different pathway this could be enabled at this point in the process. So firming up the Partnership bind or releasing from the bind is possible at this point of the process.
Toru
(Timeframe guideline 9-15 months dependent on development requirements.)
Whā
(Timeframe guideline 3-6 months again dependent on plan to exit.)